The works will have a budget of 144,000 euros
Murcia City Council carried out works of improvement and adaptation of the Children's Traffic Park for an amount of 144,000 euros.
This was approved by the Governing Board this morning.
The aim of the Consistory is to increase the quality of these facilities for the training of the smallest in terms of road safety education is the best.
The work must have a duration of two months and employ 14 people.
The works will be on the existing building in the city of Murcia, located in Mula River Street s / n.
This project is justified by the need to repair, condition and improve facilities and use elements that are given and the age of the building, so that the center has the optimum conditions from the point of view of maintenance for school year 2010/2011.
The adjustments will not change projected volumes, alignments or flush.
Works to be performed:
- Adequacy of sidewalks and drainage.
- Paving of roadways with painted lines.
- Placement of signage discs.
- Installation of traffic lights.
- Maintenance Repair toilets, warehouse, office and classroom.
This project is included in the State Fund for Employment and Local Sustainability.
Source: Ayuntamiento de Murcia