Portal de Murcia

www.portaldemurcia.com

Murcia - SpanishMurcia - English
detail of Murcia

 

A step towards the construction of road linking the new ring Citmusa Sangonera (13/03/2009)

Murcia City Council has provisionally awarded the work to build a new road will reduce traffic congestion in the vicinity of the Green Sangonera.

This is a new road connecting the Integrated Transport Centre de Murcia (Citmusa) with the new ring Sangonera la Verde.

This road will be of great capacity, will have two lanes in each direction (3.50 meters each), shoulder internal (from 0.50 meters) wide outside (1 meter), central median (2.50 meters) and bike path (2.50 meters), which is protected by bollards so that no vehicle can invade the space.

The new road will have a total length of 523.98 meters, and will feature two pavilions outside diameter 70 meters.

The Consistory will invest 2.4 million euros in this new infrastructure, which will have a lead time of 6 months.

The work has been provisionally awarded Cnes.

Schillings Brothers, SA

The City will construct the new road to growth in recent years has experienced the hamlet and the development of industrial and commercial areas around.

Roads MU-603 and E-1 (Industrial Park West and Central Integrated Transport) to support daily average traffic of 9336 (9% heavy vehicles) and 3877 (4.5% heavy vehicles) vehicles per day, respectively.

With this new road will avoid the traffic jams, will allow traffic access to new residential and tertiary, will improve the existing access and will provide the city a new cycle paths.

Source: Ayuntamiento de Murcia

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
This website uses cookies to facilitate and improve navigation. If you continue browsing, we consider that you accept its use. More information