Note from PSOE:
PSOE spokeswoman, Maria Jose Alarcon, denounced the institutional unfairness and hypocrisy of the mayor, who with one hand collects the money from the Local Investment Fund and the other concealed information to citizens not to relate the Socialist Government Spain with the largest local state investment in the municipality of Murcia
Gardens, sidewalks, asphalt, large road, bike paths, renovation of the soccer fields are among the projects to be carried out thanks to 49,469,092 euros that the Fund has allocated ZP Murcia, through 46 awards definitive, there are still another 25 million euros to come to the municipality out of lack of investor appetite for the PP in the Glorieta.
The Consistory not put a euro
In this regard, the spokesman for the PSOE, José María Alarcón, denounced the disgraceful spectacle that is starring in Murcia Mayor announcing these works as investments of the Municipality of Murcia, where the Session does not put even a single euro.
"The right thing is to talk about investment in Murcia and not the City of Murcia, Socialist spokesperson clarified.
Institutional disloyalty
According to Alarcón, "House is making a tremendous institutional disloyalty to hide over and over again, with malice aforethought, the investment efforts of the Government of Spain, with the money of the Spanish, will transform the city of Murcia.
The hypocritical attitude of the PP in La Glorieta, regrets the PSOE spokesman, is also reflected in each and every one of the announcements made through the 'Hall reports "and in appearances before the media.
"With one hand Fund collects money ZP, without shame, the other concealed information to citizens not to relate the Socialist government of Spain with the largest investment in Murcia local state."
The double standard
Likewise, Alarcon complained that "the double standards of House goes further, to the extent that force companies Murcia awarded for the works to install another unnecessary poster, after criticizing actively and passively by the Government of Spain that first out is the City of Murcia. "
It is unacceptable end-to-house forces companies in the specifications to include such a cartel, when the Royal Decree that regulates the ZP Fund does not permit, putting at risk the arrival of this money for breaking the law
FINAL WORKS SHOE FUND AWARDS
Remodeling garden near the cultural center Sucina. ZP Fund: 146,550.86 euros.
Renovation of the garden on Calle La Paz de La Nora.
ZP Fund: € 145,775.93.
Remodeling of the right bank gardens, vegetable garden of Murcia, sector 5. ZP Fund: € 128,964.
Refurbishment of gardens in the Campo de Murcia and Los Martínez del Puerto. ZP Fund: € 21,077.59.
Boatmen garden remodeling. ZP Fund: € 86,637.93.
Remodeling of two gardens in the neighborhood of El Carmen. ZP Fund: € 274,606.98.
Ponce garden remodeling in the neighborhood of the fleet. ZP Fund: € 273,770.13.
West Garden Remodeling in New Javalí. ZP Fund: € 195,758.30.
Construction of sidewalks in the downtown neighborhoods, La Fama, La Paz and Vistabella in Murcia. ZP Fund: € 1,663,581.35.
Construction of sidewalks in the neighborhood Board Infante Don Manuel de Murcia. ZP Fund: € 1,760,510.93.
Construction of sidewalks in the neighborhood of El Carmen de Murcia. ZP Fund: € 1,034,482.76.
Construction of sidewalks in the neighborhoods of San Anton, San Basilio and the Ranero of Murcia. ZP Fund: € 1,282,512.13.
Construction of sidewalks in the neighborhoods of Santa María de Gracia, The Fleet and Vistalegre of Murcia. ZP Fund: € 1,821,725.
Construction of sidewalks in the neighborhoods of San Andres and San Antolin de Murcia. ZP Fund: € 1,189,856.65.
Construction of garden on Calle San Antonio de Murcia. ZP Fund: € 438,828.
Construction of 240 graves and 400 niches in the cemetery Nuestro Padre Jesús de Espinardo. ZP Fund: € 705,895.21.
Installing artificial turf on the football field Puebla de Soto. ZP Fund: € 328,943.97.
Installing artificial turf on the football field Sangonera La Seca. ZP Fund: € 359,499.56.
Installing artificial turf on the football field Casillas. ZP Fund: € 328,967.92.
Installing artificial turf on the soccer field New Javalí. ZP Fund.
€ 243,981.23.
Installing artificial turf on the football field Javalí Viejo. ZP Fund: € 239,926.64.
Installing artificial turf on the soccer field of El Raal. ZP Fund: € 364,841.55.
Installing artificial turf on the football field The Esparragal. ZP Fund.
€ 307,830.68.
Installing artificial turf on the football field The Strut. ZP Fund.
€ 311,291.24.
Installing artificial turf on the football field Torreagüera. ZP Fund: € 275,395.85.
Installing artificial turf on the football field Sucina. ZP Fund: € 287,469.94.
Installing artificial turf on the football field Espinardo. ZP Fund: € 286,465.22.
Installing artificial turf on the football field Cabezo de Torres. ZP Fund: € 391,406.29.
Installing artificial turf on the football field Churra. ZP Fund: € 289,744.56.
Installing artificial turf on the football field Zeneta. ZP Fund.
€ 297,183.57.
Installing artificial turf on the football field in La Alberca. ZP Fund: € 335,483.82.
Roundabout on Juan Carlos I, northern access to the University of Murcia. ZP Fund: € 3,143,707.95.
Extension of road connecting Sangonera Sangonera La Seca and La Verde, structure passing over the river and connect to the variant of Sangonera La Verde. ZP Fund: € 4,631,279.85.
Preparation and unfolding of the access bridge to New Condomina, Churra and Cabeza de Torres. ZP Fund: € 1,422,134.55.
Road infrastructure connecting to the access road MU-603 ring road and Sangonera La Verde. ZP Fund: € 1,997,819.81.
Installing artificial turf on the football field Sangonera La Verde. ZP Fund: € 356,155.32.
Construction of sidewalks on the avenue de Murcia Alicante. ZP Fund: € 538,686.59.
Wall construction in the hamlet of Monteagudo. ZP Fund: € 214,276.39.
Park Auditorium remodeling Fofó and actions in their environment in Murcia. ZP Fund: 326,668.80 euros.
Asphalt, curbs formation and placement of protections for motorists in urban streets of Murcia. ZP Fund: 3,189,603.21 euros.
New road infrastructure connecting Avenida Juan Carlos I and southern access to the Campus of Espinardo, University of Murcia, Espinardo and the strut. ZP Fund: 5,266,237.20 euros.
Construction of soccer field dressing in Los Garres. ZP Fund: 238,000 euros.
Construction of changing rooms on the football pitch prop. ZP Fund: 238,960 euros.
Running bike path between Beniscornia corner and the bike path and lighting Contraparada between Paseo del Malecon Beniscornia corner. ZP Fund: 2,347,343.32 euros.
Installing artificial turf on the football field Patiño. ZP Fund: 331,666.90 euros.
Dressing in Churra football field.
ZP Fund: 233,000 euros.
Source: PSOE de Murcia