Portal de Murcia

www.portaldemurcia.com

Murcia - SpanishMurcia - English
detail of Murcia

 

Neighbors of the Seca Sangonera have a new sewage (24/11/2008)

Murcia City Council has awarded Urdecón SA Construcciones definitely the project for the construction of a collector of sewage and stormwater to improve sanitation in Sangonera la Seca and the Center for Integrated Transport (Citmusa).

This project is part of Hydraulic Infrastructure Plan for South Coast provide a solution to the disposal of rainwater-faecal Sangonera the Seca and new developments that are taking place in the area.

It so happens that the current collector Seca Sangonera the hydraulic capacity is exhausted.

This is a large pipe diameter, 1.600mm, a length of 1,218 meters and at a cost of more than 2 million euros.

The works, which will start soon, have a lead time of 12 months.

The great collector take the sewage from the right bank of Reguerón, it connects with the collector reaches the Wastewater Treatment Station (STP) of Murcia.

Storm water, when diluted, will be discharged directly to Reguerón channel.

The project includes the construction of three pumps for the sewage discharge and three pumps for lifting of stormwater and the construction of a footbridge over the Reguerón for which the collector will run and which may be used at the same time by pedestrians.

Source: Ayuntamiento de Murcia

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
This website uses cookies to facilitate and improve navigation. If you continue browsing, we consider that you accept its use. More information