The people of El Raal will have new sidewalks and a renewed church square through the investment of 200,000 euros from the Department of Infrastructure and Community Services led by José Arce.
The work planned for the rehabilitation and improvement of the town of El Raal consist of resurfacing of the plaza of the Church of Our Lady of Sorrows, the construction of 400 meters of steel in Vereda de la Torre, the construction of a section sidewalk and parking in line on Main Street in El Raal, next to the road of the road F-2, and the piping of the ditch 200 meters from New Raal.
The renovation of the pavement of the plaza of the church planned to remove the two existing levels and replace your damaged precast terrazzo pavers, facilitating the movement of pedestrians in this area.
Also reshaped the main street of the hamlet with the construction of sidewalks.
This project aims to unify the same cobblestone sidewalks and the same width across the street.
The works will start soon and have a lead time of 4 months old.
Source: Ayuntamiento de Murcia