Public Service Via Murcia City Council will carry out refurbishment works on the Plaza del Pilar (San Nicolas) and Zarandona Plaza (San Bartolomé), which will affect all the public spaces.
In the Plaza del Pilar is changed by replacing the pavement, granite-and improve the environment.
Likewise, in the Plaza Zarandona (better known as Plaza de la scale) will be carried out a survey of grade, will be eliminated beds, replace the existing concrete pavement and cobblestone street lighting will be renewed.
The period of execution of the works is about a month.
Source: Ayuntamiento de Murcia