The output Nora has recovered good for circulation after the work done by the council, which has allowed to fix a sinkhole that appeared in the asphalt to mid-July.
The Department of Public Works took over the work, consisting in strengthening the walls of the Old and ditches Churra Alfatego that pass along the road.
The operation, carried out in coordination with the General Directorate of Roads and the Board of Landowners, allowed traffic on this road was normalized on 31.
Source: Ayuntamiento de Murcia