The purpose of this work has been to improve the drainage system of a stretch of Calle Marques de Corvera (between Plaza Alameda Martinez Conde and Capuchins), replenishing and scuppers running new roadway (a total of 23 units) and eliminating odors from the sewer system by installing hydraulic elements (flapper valves) in the network junctions scuppers.
In turn, has been made a recess in the ground height of about 10 cm, milling and paving the paving current again.
These works fall within the Action Plan for XXV EMUASA, with the collaboration of the Department of Urban and Infrastructure Quality.
Source: Ayuntamiento de Murcia