Portal de Murcia

www.portaldemurcia.com

Murcia - SpanishMurcia - English
detail of Murcia

 

They claim that "refuse aid to solve the space problems that the Institute takes years Cabezo Torres dragging" (30/05/2012)

This school has suffered deficiencies and needs in infrastructure and spaces, with implications for a difficult working conditions for teachers and study for students.

The Center is designed for about 380 students and is progressively increased its enrollment to the 680 this year, a situation that suffer other public centers of our region.

This is a glut of space, which in our institute consists of:

The lack of classrooms: there are many courses that do not have their own space, which means that students have to walk with backpacks between classes and during recess, with the consequent loss of time.

The lack of space for laboratories to have quality education requires: physics laboratories, languages, drawing, etc. ..

Using the library as a place to teach different classes so that the main use of it is diminished impossible, also helped to develop the learning process in the right conditions and legal action.

Despite these shortcomings and that is the only public high school that meets the educational needs of populations and Churra Cabezo de Torres, the Director General of Infrastructure and Promotion of education, D.

Jose Maria Ramirez Burgos, sees no need to execute the construction of these classrooms with the excuse that the installation of a prefabricated classroom, installed in the courtyard of the center, it alleviates the problem of lack of space.

The association of parents, accompanied by the president of FAPA Juan Gonzalez, in a recent interview with Mr. Director-General expressed total disagreement with the decision of this Council and the feeling of abandonment and neglect of this entity by the defense of a quality public school.

We wonder what else we have to do for our sons and daughters can have a center in the minimum equipment, while we urge the responsible authorities and the educational community to resolve this intolerable situation and, immediately, and not with delays of one year to another and another.

Source: FAPA-RM Juan González

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
This website uses cookies to facilitate and improve navigation. If you continue browsing, we consider that you accept its use. More information