Testing starts in 'white' or evidence 'in line' to the tram.
Tonight, between 22 and 23 hours, a vehicle will travel the distance between the stop Granada Lane (opposite Carrefour Zaraíche) and the Terra Natura Murcia.
This first test, which is part of strict security protocol has to meet the infrastructure of Line 1 before starting commercial, called "march-man" and consists of checking, by the movement of a vehicle, the state of the track, catenary and the rest of the system, all at a speed of 3 miles per hour speed close to the walking man.
Previously to this action, this morning Concessionaire's technical, joint venture construction and the Architect have walked the path along which the test was developed to verify the correct state of the facilities.
The vehicle used for these tests will be one of the trams that were circulating in the experimental stage and is currently stationed in Juan Carlos I.
Remember that the image of these two vehicles, the experimental section, will soon be adapted to the new corporate identity that can already be seen in the first car arrived from Madrid last week.
It calls for drivers, although the rate at which circulate the tram is very low, take precautions.
Source: Ayuntamiento de Murcia