Portal de Murcia

www.portaldemurcia.com

Murcia - SpanishMurcia - English
detail of Murcia

 

The Municipal Board of Sangonera la Verde repairs the damages caused by the last rains and snowfall (01/02/2017)

The Municipal Board of Sangonera la Verde has carried out numerous actions to condition the hamlet after heavy rains and snowfall that have occurred in the last month.

The pedantic of the Popular Group Juan Jiménez, reports that they have reformed sidewalks, replaced pavement and repaired leaks and ensures that they will continue working to ensure the security of the hamlet.

For this reason, several bumps and holes have been repaired that were found in the streets of the center of the hamlet, such as Rambla Street, Constitución Avenue or Mayayo Road.

In addition, the pedestrian says that "the pavement of zahorra has been replaced in Cota street, an area of ​​the orchard that has been affected by the landslides caused by the rains. Schools that were too narrow and we renovated the concrete in them. "

Also, the Municipal Board has repaired the leaks of the school Antonio Delgado Dorrego, and the ambulatory of the hamlet.

Jiménez notes that "during the snowfall of January, a special device was installed to prevent incommunicado and isolated residents living in the urbanization Torre Guil, cleaning the snow on the sidewalks to allow the entrance of vehicles.

Works in recent years

In the last five years, the Municipal Board has invested more than 1,300,000 euros in improving the safety and quality of life of the residents of Sangonera la Verde.

With this investment have been carried out the enlargements of the schools of the schools Antonio Delgado Dorrego and Nicolás Raya.

In the latter also, a pergola has been placed in the children's zone of the center and has recently expanded the fence that protects it to avoid vandalism.

In the orchard of Sangonera la Verde, Jiménez informs us, "there are numerous lanes to cover these areas, looking for the safety of the neighbors that pass by." We were also one of the first districts to install a new urban lighting Low consumption along the journey of the Church. "

Also, from the Municipal Board reformed more than 350 meters of sidewalks in different points of the hamlet, as it is the case of the street Iron, and have been repaired agitators with agglomerate in streets, what supposes a total of 200 meters of the arranged pavement .

Jiménez informs that "the work we have done at this time is aimed at improving the quality of life in the hamlet and the safety and well-being of our neighbors. From the Municipal Board we are concerned about the development of Sangonera la Verde and provide the services That are needed ".

It has also been buried 3 containers in the hamlet and has been arranged in an integral way the residential garden Girasoles, with new paving stones, rest area, etc.

To this park is added the reform and restructuring of the garden of the street of the Rejas, and the one of the water deposit.

Source: PP Murcia

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
This website uses cookies to facilitate and improve navigation. If you continue browsing, we consider that you accept its use. More information