Portal de Murcia

www.portaldemurcia.com

Murcia - SpanishMurcia - English
detail of Murcia

 

[Llano de Brujas will have a Municipal Center of 800 m2 and the first 24-hour study room (29/12/2020)

Jos Ballesta: "We improve the quality of public services with new dependencies for culture and training, which respond to the needs of the residents of the district, whose population has increased by about 1,500 inhabitants in the last 20 years " The mayor of Murcia, Jos Ballesta, together with the councilor for Pedan as and Barrios, Marco Antonio Fern ndez, today presented the project for the implementation of the Municipal Center of Llano de Brujas, a new infrastructure with two floors of m It is 800 m2 which will be accessed through a new 250 m2 square on Gonz lez Valent n street in the district. “This action responds to a claim from the residents of the district, especially the youngest, since they will have a study room open 24 hours a day, with Internet and all benefits ”, highlighted Jos Ballesta, who added that“ a function room with capacity for 200 attendees will also be opened, fully accessible and adapted to people with reduced mobility; an improvement in public services with new dependencies for culture and training in this district, whose population has increased by about 1,500 inhabitants in the last 20 years, from 4,300 to the last 20 years.

More than 5,700 today ”. The project, which is in tender and whose deadline for submitting offers has closed today, has a base tender budget of 834,256 euros.

The works are scheduled to begin at the end of the first quarter of 2021.

The execution period of the works is 10 months. Classrooms-workshop, attention to the citizen and City Hall The new center will have a 24-hour study room that will have independent access from the street, through integration into the SICAi system that controls all municipal study rooms.

In addition, you will have an exclusive toilet for use 24 hours a day. The infrastructure will house the citizen service with three offices and will also have a function room with capacity for 200 people. On the upper floor there will be two classrooms-workshops, an office for the coordinator, a toilet area and a multipurpose room with views of the double height provided in the assembly hall, so that it can eventually be used as a conference room.

control or expansion of capacity.

The center will have a staircase and an elevator, in addition to a City Hall area, toilets and a warehouse. Currently, the provision of these public is carried out in the municipal building that is located in the Plaza de la Mayor.

Its transfer will allow to expand the space for the realization of workshops, activities and courses that the associations of the district give weekly. The project is completed with the redevelopment of the immediate surroundings of the building, which includes perimeter sidewalks and a front plaza with pedestrian and green areas with the planting of ten new trees. Pedan as Investment Plan This project that the City Council is going to execute in Llano de Brujas is part of the Pedan as Investment Plan, which includes renovation and improvement of sports, cultural and urban infrastructures that will benefit the residents of Barrio del Progreso, Casillas, El Raal, La Albatal a, Los Dolores, Llano de Brujas, Nonduermas, El Esparragal, Barriomar, Corvera, Sangonera la Seca, Sangonera la Verde and Zeneta. These 13 projects are as follows: 1.

Sidewalk paving project in the Barrio del Progreso (61,790.83 euros) 2.

Basic project and execution of a room for a nativity scene in Casillas (365,975 euros) 3.

Project for the adaptation of the existing building as a 24-hour study room in El Raal (219,649 euros) 4.

Project for the execution of a bridge over the Aljuf a canal in La Albatal a (90,110.85 euros) 5.

Basic project and execution of municipal center in Los Dolores (422,272 euros) 6.

Basic project and execution of municipal center in Llano de Brujas (834,256 euros) 7.

Basic and execution project for expansion of the municipal center in Nonduermas (211,738 euros) 8.

Basic project and implementation of changing rooms in the football field of El Esparragal, Murcia (102,244.99 euros) 9.

Paving project for sidewalks and road in Barriomar (228,113.50 euros) 10.

Locker rooms and improvements in the Corvera football field (198,440.01 euros) 11.

Changing rooms and improvements in the Sangonera La Seca football field (225,060 euros) 12.

Tennis, paddle tennis and skate court in Zeneta (94,380 euros) 13.

Project to repair roads in the municipal forest park of Majal Blanco (69,652.84 euros) 10 PEIP projects completed and 14 under execution Asimismo, dentro del Plan Extraordinario de Inversiones de Pedan?as se encuentran actualmente en ejecuci?n 14 proyectos, por importe de 3.030.294 euros: -?Proyecto de construcci?n de pistas deportivas y zona de skate en Algezares? -?Proyecto b?sico y de ejecuci?n para remodelaci?n y ampliaci?n del centro municipal de Aljucer? -?Proyecto de cubierta de pista polideportiva existente en el patio del colegio de El Bojar-Beniaj?n -?Reforma de planta baja del centro social de mayores de Cabezo de Torres -?Proyecto constructivo del nuevo recinto ferial -?Proyecto b?sico y de ejecuci?n para la adecuaci?n de local existente como sala multiusos en el consultorio m?dico de Era Alta -?Proyecto b?sico y de ejecuci?n para consultorio local de Javal? Nuevo -?Proyecto b?sico y de ejecuci?n para la reforma interior del centro de mayores existente en La Ñora -?Proyecto b?sico y de ejecuci?n para remodelaci?n de la planta primera y acceso en planta baja del edificio del casino de Los Garres -?Proyecto de pavimentaci?n de calle Mart?nez Costa de Monteagudo -?Playground Patiño -?Proyecto de cubierta de pista polideportiva existente en el patio del colegio de Puebla de Soto -?Proyecto b?sico y de ejecuci?n para creaci?n de sala de estudios 24 h.

en actual alcald?a y reubicaci?n de la misma en el antiguo edificio del centro de mayores de San Jos? de la Vega. -?Proyecto de cubierta de pista polideportiva existente en el patio del colegio de San P?o X Durante este año y los ?ltimos meses de 2019, han finalizado las obras de otros 10 proyectos que forman parte del Plan Extraordinario de Inversiones en Pedan?as, y que han supuesto 1.223.845 euros: -?Proyecto de pavimentaci?n de calle Polic?a Municipal Manuel Gonz?lez Marco y otras de Lobosillo -?Colocaci?n de c?sped artificial en el campo de futbol 7 existente en Guadalupe -?Proyecto de reparaci?n de instalaciones del polideportivo de Santa Cruz -?Proyecto b?sico y de ejecuci?n para la adecuaci?n de local existente como sala de estudios 24 horas en Zeneta -?Proyecto de pavimentaci?n de calzada y sistemas de contenci?n en camino del Reguer?n, Alquer?as? -?Proyecto de ejecuci?n de obras de drenaje transversal sobre carretera F-19 de Gea y Truyols -?Jard?n Vereda del Chocolate de Los Ramos -?Proyecto de pavimentaci?n de aceras y calzada en Sangonera la Verde -?Proyecto de remodelaci?n de plaza Antonete G?lvez de Torreag?era -?Proyecto b?sico y de ejecuci?n para la adecuaci?n de local a centro de mayores en Espinardo Crece un 42% el presupuesto de inversi?n directa en pedan?as El presupuesto para inversi?n directa de las juntas municipales se ha incrementado en este ejercicio un 41,86% respecto al año 2019. De esta forma a los 5.314.648 euros para inversi?n que contempla el proyecto de presupuestos de 2020 hay que sumar un presupuesto adicional de 2.225.000 euros, procedente de remanentes de la Concejal?a de Pedan?as y Barrios, por lo que el presupuesto para inversi?n directa de las juntas municipales ascender? a 7.539.648 euros.? Esta l?nea presupuestaria se invertir? por un lado en mejoras de las construcciones existentes como centros educativos deportivos, culturales, sociales o recreativos (1’1 mill?n de euros) y, por otro, en mejoras de la v?a p?blica en las pedan?as (1’25 millones de euros).? function { ;(, , {});}

Source: Ayuntamiento de Murcia

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
This website uses cookies to facilitate and improve navigation. If you continue browsing, we consider that you accept its use. More information