The Councilor for Pedanías y Barrios, Marco Antonio Fernández, and the Councilor for Sports and Health, Felipe Coello, have visited this morning the works that are being carried out in Santa Cruz, within the Extraordinary Investment Plan in Pedanías.
In this way, the work consists of repairing the sports center facilities.
Specifically, the indoor soccer field has been paved, which has been made with a slight transverse slope to collect the drainage water in the new conduit that has been installed for this purpose.
In addition, some superficial fissures of the tennis and basketball courts have been repaired, the slope of the common area has been elevated, next to the entrance to the sports venue, to match it to that of the courts and thus avoid the current risk of injuries due to the existing level difference.
Likewise, all the internal wiring of the four lighting towers that illuminate the soccer field with projectors has been replaced.
The surface painting works are currently being developed.
The Sinboria company is responsible for these works for a cost of 98,391 euros.
Source: Ayuntamiento de Murcia