The residents of Era Alta will have a new multipurpose room, thanks to the work that will be developed on the first floor of the old casino where the medical office of the parish is located, located on Carmen Street.
This will create a multipurpose room of 127 square meters, an office, toilets, a storeroom and an access lobby.
In addition, the current terrace will be covered with a wrought iron structure to connect it to the interior space and be able to use it during all times of the year.
Inside there will be a diaphanous space with two large spaces, the multipurpose room and the access lobby, and some services (toilets and storage) and an office.
This project, which will invest 110,376 euros and will be executed in 6 months, is part of the Extraordinary Investment Plan in Pedanías, coordinated by the Department of Pedanías, Participación and Decentralization, directed by Marco Antonio Fernández.
Source: Ayuntamiento de Murcia